PK 116-1 Heavy Lift


PK 116-1
MV Palmerton, delivered Oct 2009
MV Palabora, delivered Feb 2010
MV Palembang, delivered July 2010
MV Palau, delivered Sept 2010
MV Hyundai Phoenix, delivered Nov 2010
MV Hyundai Pegasus, delivered Feb 2011
Heavy lift vessel with 2 x 450 t cranes. Tandem lift 900 t.
- Design and complete tender documentation.
- Advanced 3D FEM analysis of hull structure, especially care foundations and ships sides
- Evaluation of quotations and assistance during contract negotiations
- Extensive engineering package for the Yard; structural, machinery, outfitting.
- Coordination of engineering package by several subcontractors
Loa
133,00 m
B
23,00 m
DW
10 000 t
Tonnage
10 200
Main engine
7 200 kW
Ice glass
GL E3
Owner
Harren & Partner, Germany
Yard
Kouan Shipyard, China (K)